NEW QUESTION # 31
In which three ways does Supply Chain Orchestration enrich supply requests with project details to support outside processing for a project-specific work order?

  • A. Expenditure Type is sat to the expenditure type associated to the outside processing Item.
  • B. Supply Chain Orchestration initiates the creation of a purchase order without the work order.
  • C. Supply Chain Orchestration initiates the creation of a requisition with the project details.
  • D. Expenditure Item Date is set to the receipt date and Expenditure Organization is set to the manufacturing plant.
  • E. Expenditure Item Date Is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant.

Answer: A,C,E

Explanation:
Supply Chain Orchestration (SCO) plays a vital role in managing project-specific work orders, particularly for outside processing. Here's how it enriches supply requests with project details:
* Statement B : Expenditure Item Date is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant - In project-specific work orders, Supply Chain Orchestration assigns the need-by date as the Expenditure Item Date. The Expenditure Organization is typically set to the manufacturing plant handling the work order.
Oracle Fusion Project-Driven Supply Chain documents this behavior, showing how expenditure details are linked to the project for costing purposes.
Statement D : Supply Chain Orchestration initiates the creation of a requisition with the project details - SCO automatically creates a requisition with all relevant project details, such as project number, task, and expenditure information. This ensures that the procurement process is aligned with the project's financial and material requirements.
Reference : Oracle SCM Cloud Supply Chain Orchestration User Guide details the automated creation of requisitions with project data for external processing.
Statement E : Expenditure Type is set to the expenditure type associated with the outside processing item - In Oracle Cloud, expenditure types must align with the specific processing items. SCO ensures that the correct expenditure type is applied to the work order and subsequent requisitions.
Reference : Project Financial Management guides in Oracle SCM Cloud explain how expenditure types are associated with items, ensuring accurate costing.
Incorrect Statements:
Statement A : SCO does not initiate the creation of a purchase order without the work order. A work order is essential for processing the outside work, and its absence would disrupt the orchestration process.
Statement C : The Expenditure Item Date is not set to the receipt date but rather to the requested need-by date for proper alignment with project scheduling.


NEW QUESTION # 32
A Production Supervisor queries a work order, WO-1025, from the Manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, the supervisor finds a General Information, Operations, and History tab, but no Reservations tab.
What are two reasons for the Reservations tab not being displayed for WO-1025?

  • A. It Is not a Drop-Ship work order.
  • B. It is not a Plan-to-Produce work order.
  • C. It is not a Pick-to-Order work order.
  • D. It is not a Back-to-Back work order.
  • E. It is not a Configured Item work order.

Answer: D,E

Explanation:
In Oracle Manufacturing Cloud, the Reservations tab on the Edit Work Order page is displayed only for specific types of work orders that require reservations of components or materials. The absence of the Reservations tab in work order WO-1025 indicates that the work order is not one of the following types:
* Configured Item Work Order (A) : Configured items are typically built based on specific customer requirements, and reservations of components are often necessary. Since WO-1025 is not a configured item work order, the Reservations tab is not shown.
* Back-to-Back Work Order (E) : Back-to-back work orders are linked to sales orders and require reservations of materials to fulfill the specific demand. Since WO-1025 is not a back-to-back work order, the tab is not displayed.
Incorrect options:
* B, C, D : Drop-Ship, Pick-to-Order, and Plan-to-Produce work orders do not typically require reservations in the same way as configured or back-to-back orders, which is why they are not the reasons for the absence of the Reservations tab.
Oracle Cloud documentation on work order types and the Reservations tab explains the conditions under which reservations are required and when the tab is displayed.


NEW QUESTION # 33
The pick release of a project work order creates movement requests with the project and the task from the work order.
Which statement is NOT true about this?

  • A. The expenditure type, expenditure date, and expenditure organization are derived when the work-ln- process material issue or work-in-process material pick transactions are interfaced to Costing.
  • B. The expenditure type for the item is derived based on the Default Expenditure Type attribute in Inventory Management. The picks for the work order ore grouped by project costing, project, and task using pick slip grouping rules.
  • C. The expenditure type and the expenditure organization from the work order are referenced onto the shop floor movement requests.
  • D. The expenditure type and the expenditure organization from the work order are not referenced onto the shop floor movement requests.

Answer: D

Explanation:
When pick release creates movement requests for project-based work orders, there are several key points regarding expenditure information:
* Statement D : The expenditure type and the expenditure organization from the work order are not referenced onto the shop floor movement requests - This statement is correct because the expenditure type and organization are not typically included in the shop floor movement requests. These requests focus more on the material movement aspects, while expenditure details are managed elsewhere in the system.
Oracle Cost Management documentation clarifies that shop floor movement requests handle inventory and material flow, and expenditure information is derived later in the process, not directly tied to these requests.
Incorrect Statements:
Statement A : The expenditure type, date, and organization are derived when interfacing with Costing, which ensures that project-related costs are tracked accurately.
Statement B : The expenditure type for the item is derived based on the default expenditure type in Inventory Management, which is true for how items are picked for a work order.
Statement C : Expenditure type and organization from the work order are referenced in costing, but not directly on movement requests.


NEW QUESTION # 34
You are defining a standard operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Which setup task must you perform to achieve this?

  • A. Ensure that the Charge Type of the resource is Automatic.
  • B. Select the Count Point check box while defining the standard operation.
  • C. Select the Automatically Transact check box while defining the standard operation.
  • D. Deselect the Count Point check box while defining the standard operation.

Answer: B

Explanation:
In Oracle Manufacturing Cloud, when defining a standard operation such as visual inspection, marking it as a Count Point ensures that its completion will be tracked and reported for all work orders referencing it. A Count Point operation is one where progress must be explicitly recorded, allowing visibility into work order completion.
* Selecting the Count Point check box ensures that this operation becomes a mandatory checkpoint where users must report completion in all related work orders. This is essential for operations like visual inspection, where reporting completion is critical to production quality.
Oracle Manufacturing Cloud documentation on defining standard operations explains the significance of using the Count Point functionality to enforce operation completion reporting.


NEW QUESTION # 35
Which is NOT a required setup task for Manufacturing master data?

  • A. Manage Work Areas
  • B. Manage Plant Parameters
  • C. Manage Plant Profiles
  • D. Manage Work Centers
  • E. Manage Production Resources

Answer: C

Explanation:
In Oracle Manufacturing Cloud, setting up the Manufacturing master data involves a series of required tasks to enable production operations. The following are the key setups:
* Manage Production Resources : This setup task is essential for defining resources such as labor, equipment, and tools that are used in the manufacturing process. Resources are vital to the production planning and scheduling functions.
* Manage Plant Parameters : This task is required to define how the plant will operate in terms of material handling, scheduling, costing, and other key operational metrics. These parameters control important aspects of how manufacturing will function at the plant level.
* Manage Work Centers : Work centers represent the physical or logical locations where manufacturing operations occur. They must be set up for scheduling and executing production activities.
* Manage Work Areas : Work areas are required to group related work centers and define operational zones within a plant. This is important for organizing production and ensuring efficient material flow.
* Manage Plant Profiles : This task is not required for setting up manufacturing master data. Plant profiles are typically used for broader plant-level settings but are not directly tied to the manufacturing execution setup.
Oracle Manufacturing Cloud Implementation documentation outlines the mandatory steps needed to set up the manufacturing process, including work centers, work areas, resources, and plant parameters. Plant profiles are part of more administrative configuration and are not directly tied to production execution.


NEW QUESTION # 36
Which three requirements are fulfilled by nonstandard work orders?

  • A. Rescheduling
  • B. Repair
  • C. Prototype
  • D. Rework

Answer: B,C,D

Explanation:
Nonstandard work orders in Oracle Manufacturing Cloud are used for specialized tasks that do not follow typical production processes. The following are the main requirements fulfilled by nonstandard work orders:
* Repair : Nonstandard work orders can be used for maintenance and repair tasks to fix or refurbish defective or damaged items.
* Rework : These work orders are also used for rework processes, where a product needs to be reprocessed to meet quality standards or specifications.
* Prototype : Nonstandard work orders can handle prototype production, where items are produced in small quantities for testing and development before mass production.
Rescheduling (A) is typically handled by standard work orders in the production schedule rather than through nonstandard work orders.
Oracle Manufacturing Cloud documentation on " Nonstandard Work Orders " explains how they are used for tasks such as repair, rework, and prototype manufacturing.


NEW QUESTION # 37
Production operations need operators to execute the right steps to produce quality products, so want to use " View Document Items on a Dispatch List. " Which statement is NOT true?

  • A. You can view the document item attachment in the dispatch list and on the Manage Supplier Operations page by using the attachment icon.
  • B. You cannot view the document item attachment on the Manage Supplier Operations page.
  • C. You will always see the active revision of the attachment from currently effective revision of the document from Master Organization.
  • D. You can add attachments to the document item and invoke the engineering change order to release the latest revision of the document item and attachment.

Answer: C

Explanation:
When using the " View Document Items on a Dispatch List " functionality, production operators can view and access necessary document attachments to ensure correct steps in the manufacturing process. The statement that is not true is:
* Statement B is incorrect because you do not always see the active revision of the attachment from the currently effective revision in the Master Organization. The revision displayed in the dispatch list may depend on the specific version that was assigned to the work order or operation at the time of creation, not necessarily the most current revision in the Master Organization.
Correct statements:
* Statement A : Document attachments cannot be viewed on the Manage Supplier Operations page.
* Statement C : Attachments can be added to document items, and updates can be managed through engineering change orders.
* Statement D : Document item attachments are viewable both in the dispatch list and on the Manage Supplier Operations page via the attachment icon.
Oracle Manufacturing Cloud's " Dispatch List " functionality documentation outlines how document item attachments are handled and displayed.


NEW QUESTION # 38
Your customer needs to add additional information to their work order traveler. Which statement is NOT true about the Extensible Work Order Traveler?

  • A. You can generate the Extensible Work Order Traveler report only from the Review Dispatch List and Manage Supplier Operations pages.
  • B. Operators can invoke it by using the Generate Extensible Work Order Traveler Report task.
  • C. It is a critical document that travels with the physical material during production.
  • D. You use Page Composer to display only the required actions.
  • E. The production operator can invoke It from the Manage Work Orders, Review Dispatch ust. and Manage Supplier Operations pages.

Answer: A

Explanation:
The Extensible Work Order Traveler is a customizable report that contains detailed information about a work order and travels with the physical material during production. The statement that is not true is:
* Statement A is incorrect because the Extensible Work Order Traveler report can be generated from multiple locations within Oracle Manufacturing Cloud, including the Manage Work Orders, Review Dispatch List , and Manage Supplier Operations pages. It is not limited to only the Review Dispatch List and Manage Supplier Operations pages.
Correct statements:
* Statement B : The Extensible Work Order Traveler is a critical document used to communicate work order details during the production process.
* Statement C : Production operators can invoke the traveler from several key pages like Manage Work Orders and Review Dispatch List.
* Statement D : Operators can use the task " Generate Extensible Work Order Traveler Report " to invoke the report.
* Statement E : You can use Page Composer to customize the Extensible Work Order Traveler and display only the required actions, allowing flexibility in what information is presented.
Oracle Cloud documentation on the Extensible Work Order Traveler explains how the report can be invoked from various areas within the application and how it can be customized using Page Composer.


NEW QUESTION # 39
Your customer runs production 24 x 7 x 365 and wants to track Overall Equipment Effectiveness (OEE) online.
Which key setup can they use to achieve this?

  • A. Enable IoT Asset Monitoring and turn on " Enable synchronization to IoT Asset Monitoring " In Plant Parameters.
  • B. Enable IoT Fleet Monitoring and enable synchronization to IoT Production Monitoring in Plant Parameters.
  • C. Enable IoT Asset Monitoring and turn on " Enable synchronization to IoT Asset Monitoring " in Resources.
  • D. Enable IoT Production Monitoring and turn on " Enable synchronization to IoT Production Monitoring
    " In Inventory Organization.
  • E. Enable IoT Production Monitoring and turn on " Enable synchronization to IoT Production

Answer: D


NEW QUESTION # 40
A Production Operator needs to load work order operation transactions from an external system into Manufacturing Cloud.
What is the correct sequence of tasks to achieve this?

  • A. Load data to data repository > Export file to UCM server > Process import operations transactions > Load file from UCM to Interface table.
  • B. Load data to data repository > Load file from UCM to interface table > Export file to UCM server > Process import operations transactions.
  • C. Load data to data repository > Export file to UCM server > Load file from UCM to interface table > Process import operations transactions.
  • D. Export file to UCM server > Load data to data repository > Process import operations transactions > Load file from UCM to interface table.

Answer: C

Explanation:
When loading work order operation transactions from an external system into Oracle Manufacturing Cloud, the correct sequence of tasks is:
* Load data to the data repository : This step ensures the external data is available in Oracle Manufacturing Cloud.
* Export file to UCM server : The data file is then exported to the Universal Content Management (UCM) server, which acts as a staging area for further processing.
* Load file from UCM to interface table : The data from the UCM server is loaded into the appropriate interface table.
* Process import operations transactions : Finally, the system processes the imported transactions and updates the work orders accordingly.
Incorrect sequences:
* Options A, B, C do not follow the correct order, particularly around the interaction between the UCM server and the interface tables.
Oracle Manufacturing Cloud documentation on File-Based Data Import (FBDI) explains the necessary steps and sequence for loading work order transactions from external systems.


NEW QUESTION # 41
Your client is planning to override the Plant Production Calendar with One or More Date-Effective Work Center Calendars. You need to explain the consideration when using the Override the Plant Production Calendar with One or More Date-Effective Work Center Calendars feature.
Which three statements are true when overriding the production calendar?

  • A. While defining override calendars, you need to ensure that the date effective range for a work center calendar association can be overlapping and contiguous.
  • B. When the user executes search action in the Review Dispatch List page, if more than one work center are selected and if the start date or completion date is based on Shift-based search, then the operations are queried based on the shifts of the plant calendar only.
  • C. The Work Execution Work Area Infolets and Manage Production Exceptions page are based on the plant calendar and not on work center calendars.
  • D. Supplier operations used in outside processing use the work center calendar in work order scheduling.
  • E. Even if there are override calendars, the lead time calculation in days for an item remains based on the plant calendar and not on work center calendars.

Answer: B,C,E

Explanation:
Overriding the plant production calendar with date-effective work center calendars provides flexibility in scheduling specific work centers with different operating hours. However, certain aspects of production planning and execution remain tied to the plant-level calendar. Here are the details:
* Statement A : The Work Execution Work Area Infolets and Manage Production Exceptions page are based on the plant calendar and not on work center calendars - Even when work centers have their own calendars, the high-level overview and exception reporting remain based on the plant calendar.
* Statement C : Lead time calculation in days for an item remains based on the plant calendar - Lead times are calculated using the plant calendar, regardless of work center-specific calendars, ensuring consistency in planning.
* Statement D : Search actions in the Review Dispatch List page query operations based on the plant calendar shifts when multiple work centers are selected - For consistency in dispatching, the system references the plant calendar when shift-based search parameters are used across multiple work centers.
Incorrect Statements:
* Statement B : Date-effective ranges for work center calendars should not overlap for accuracy in scheduling.
* Statement E : Supplier operations in outside processing generally rely on the plant calendar for consistency unless explicitly configured otherwise.
Oracle Manufacturing Cloud documentation on " Calendar Overrides " explains how plant and work center calendars interact and the impact on work execution, scheduling, and reporting


NEW QUESTION # 42
Your client informs you that after running the " Process Item Structure Changes to Work Definitions " scheduled process, they received a workflow notification.
Which statement is NOT a workflow notification that you might get if automation is not performed?

  • A. The manufacturing plant Is enabled for ERES, the work definition changes are not expected to go through an approval process.
  • B. The original component has been assigned to more than one work definition operation.
  • C. The replacement component has been assigned as an ad hoc Item to the same operation as the original component.
  • D. The original component is not assigned to any work definition operation.

Answer: A

Explanation:
After running the " Process Item Structure Changes to Work Definitions " scheduled process, a series of workflow notifications may be triggered if the automation is not performed properly. The following notifications can be expected in scenarios where manual intervention is needed:
* Statement B is incorrect because, in Oracle Manufacturing Cloud, if the manufacturing plant is enabled for ERES (Engineering Release Execution System), it generally implies that any changes in work definitions would still require an approval process for validation and control. The fact that ERES is enabled would not automatically bypass the approval process.
Correct Notifications:
* Statement A : You may receive a notification that a replacement component has been assigned as an ad hoc item to the same operation where the original component was assigned.
* Statement C : A notification may alert you that the original component is not assigned to any work definition operation, signaling a potential issue that requires manual intervention.
* Statement D : It is also possible to receive a notification indicating that the original component has been assigned to more than one work definition operation, which may require review or adjustment.
Oracle Cloud documentation on " Process Item Structure Changes to Work Definitions " explains the notifications and approval steps involved when work definitions are modified without automation.


NEW QUESTION # 43
Your customer runs two daily shifts in their plant: morning shift and evening shift. A resource, LATHE, is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the morning shift and the remaining units for the evening shift.
Which two actions must the customer perform to associate LATHE with W1?

  • A. Select the Available 24 Hours check box and, in the Resource Availability region, enter 2 against LATHE in the Evening Shift column.
  • B. Deselect the Available 24 Hours check box and, in the Resource Availability region, enter ~z against LATHE in the Evening Shift column,
  • C. Deselect the Available 24 Hours check box and, in the Resource Availability region, enter 3 against LATHE in the Morning Shift column.
  • D. Deselect the Available 24 Hours check box and, in the Resource Availability region, enter 40% against LATHE In the Evening Shift column.
  • E. Deselect the Available 24 Hours check box and, in the Resource Availability region, enter 60% against LATHE in the Morning Shift column.
  • F. Select the Available 24 Hours check box and, in the Resource Availability region, enter 3 against LATHE In the Morning Shift column.

Answer: B,C

Explanation:
To allocate specific units of the LATHE resource to morning and evening shifts in Oracle Manufacturing Cloud, you need to configure the resource availability per shift as follows:
* Deselect the Available 24 Hours check box - This ensures that the resource availability is limited to specific shifts instead of being available 24/7.
* Enter 3 in the Morning Shift column - Assigning 3 units of LATHE to the morning shift allocates those units for use only during the morning.
* Enter 2 in the Evening Shift column - Assigning 2 units to the evening shift ensures that the remaining LATHE units are available for the evening shift.
Oracle Cloud SCM documentation details how to manage Resource Availability for specific shifts by configuring the number of units assigned to different shifts in a work center.


NEW QUESTION # 44
A manufacturing plant works in two shifts of eight hours each. A Manufacturing user wants four units of a work center resource, R1, to be available during nonworking time, outside the regular shift on a particular day.
Which is the correct sequence of steps to create a resource exception on the Manage Work Center Resource Calendar page?

  • A. Click outside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource drop-
  • B. Click inside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration Fields > Go to the Resource Availability region
    > Populate A units in the Default Availability column.
  • C. Click Inside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource dropdown list > Enter 4 in Default Units Available.
  • D. Click outside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration fields > Go to the Resource Availability and Overrides region > Populate 4 units in the Availability Override column.

Answer: D

Explanation:
In Oracle Manufacturing Cloud, to make a resource (R1) available outside the regular shift for a specific day, you need to create a resource exception . This allows you to override the default shift schedule and make additional units of the resource available.
* Click outside the existing shift time ensures that the exception applies to non-working hours.
* Select Create Resource Exception from the Actions menu to initiate the exception.
* Populate the Start and Duration fields to define the non-working period during which the resource will be available.
* Enter 4 units in the Availability Override column to ensure that 4 units of resource R1 are made available for use during the exception period.
Oracle Manufacturing Cloud guide on managing resource calendars explains how to override shift availability using the resource exception functionality to schedule resources outside of normal working hours.


NEW QUESTION # 45
You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.
Which setup task must you perform in the Manage Plant Parameters section to achieve this?

  • A. Set Default Transaction Mode to AIL
  • B. Set Default Transaction Mode to Entered.
  • C. Set Default Transaction Mode to Entered and Default Transaction Quantity to Work Definition.
  • D. Set Default Transaction Mode to Work Definition.

Answer: D

Explanation:
To ensure that Push components are automatically defaulted when reporting material consumption on the Report Material Transaction page, you must configure the system to use the Work Definition as the default source for transactions.
* Setting Default Transaction Mode to Work Definition ensures that the system automatically pulls the component list and quantities as defined in the work order or work definition when operators perform material transactions. This setting streamlines the material consumption process for Push supply type components.
Oracle Manufacturing Cloud ' s " Plant Parameters " configuration guide explains how to set the Default Transaction Mode to manage material transactions efficiently, particularly when dealing with Push components.


NEW QUESTION # 46
You are defining a standard operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Which setup task must you perform to achieve this?

  • A. Ensure that the Charge Type of the resource is Automatic.
  • B. Select the Count Point check box while defining the standard operation.
  • C. Select the Automatically Transact check box while defining the standard operation.
  • D. Deselect the Count Point check box while defining the standard operation.

Answer: B


NEW QUESTION # 47
Your customer is a light assembly manufacturing company that doesn ' t require shop floor control. A Manufacturing Engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must they perform and verify in the Work Definition area?

  • A. Ensure the predefined work definition name ORA_MAIN is active.
  • B. Select a resource to be used in automatic work definition by enabling the Default attribute for automatic work definition.
  • C. Select a standard operation to be used in automatic work definition by enabling the Default attribute for automatic work definition.
  • D. Ensure the item is a standard item with a secondary item structure.
  • E. Ensure there is only one default standard operation at any point in time.

Answer: A,B,C

Explanation:
In light assembly manufacturing environments where shop floor control is not required, a Manufacturing Engineer can automate the creation of work definitions to streamline production processes. The following steps must be performed and verified:
* Select a resource to be used in automatic work definition by enabling the Default attribute. This ensures that the system can automatically assign resources to the work definition without manual intervention.
* Ensure the predefined work definition name ORA_MAIN is active , as this serves as the template for automatically generating work definitions in the system.
* Select a standard operation for use in automatic work definition, also by enabling the Default attribute. This ensures that the system knows which operations to include in the work definitions.
Incorrect steps:
* C : Secondary item structure is not relevant for automatic work definitions.
* D : There can be multiple default operations, so it's not necessary to limit it to one.
Oracle Cloud SCM documentation on " Automatic Work Definitions " explains the steps and settings required for light assembly manufacturing environments.


NEW QUESTION # 48
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools, and equipment that turn raw material into a product.
Which seeded job role must you assign to this employee?

  • A. Production Operator
  • B. Manufacturing Supervisor
  • C. Manufacturing Engineer
  • D. Production Engineer
  • E. Production Supervisor

Answer: C

Explanation:
In Oracle Manufacturing Cloud, the Manufacturing Engineer role is responsible for dealing with various manufacturing practices, processes, machines, tools, and equipment that transform raw materials into finished products. This role focuses on defining and managing production processes, resources, and operations in manufacturing plants.
* Manufacturing Engineer : This role involves creating and maintaining manufacturing processes, production resources, and work instructions. It ensures that products are manufactured efficiently and in compliance with quality standards.
Oracle Cloud documentation for " Manufacturing Engineer " describes this role as the primary one for handling manufacturing setups, process definitions, and equipment management in the system.


NEW QUESTION # 49
To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.
Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?

  • A. Work definition header and version attributes
  • B. Descriptive flexfields (OFFs) at any level
  • C. Item structure component attributes referenced from Product Information Management(PIM)
  • D. Attachments at any level
  • E. Operation resources. Including alternate resources

Answer: C

Explanation:
When enabling audit trail functionality to ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), certain actions related to work definitions and standard operations are audited for changes such as creation, update, and deletion. However, not all aspects are tracked in the audit trail.
* Item structure component attributes referenced from Product Information Management (PIM) are not included in the audit trail. PIM attributes are managed separately from manufacturing-specific data, and changes to these components are not captured in the standard operations audit trail.
Audited components typically include:
* Work definition header and version attributes
* Descriptive flexfields (DFFs) at any level
* Attachments at any level
* Operation resources, including alternate resources
Oracle Manufacturing Cloud ' s documentation on audit trails details the entities that can be tracked, and PIM attributes are not part of the work definitions audit scope.


NEW QUESTION # 50
Which three types of item quantities are displayed on the Work Order History tab?

  • A. Remaining
  • B. In Process
  • C. Total
  • D. Completed
  • E. Scrapped

Answer: B,D,E

Explanation:
The Work Order History tab in Oracle Manufacturing Cloud provides a summary of different item quantities related to the lifecycle of a work order. The following quantities are displayed:
* In Process : This shows the quantity of items currently being processed in the production cycle.
* Scrapped : This quantity reflects the number of items that have been discarded due to defects or other issues during the production process.
* Completed : This quantity shows the number of items that have successfully been completed in the work order.
Incorrect options:
* Remaining : The system does not specifically display a " Remaining " quantity on the Work Order History tab.
* Total : The total quantity is not shown as a standalone metric in the Work Order History tab but is implied by other metrics.
Oracle Manufacturing Cloud documentation on work order management outlines the key item quantities that are tracked during the production process.


NEW QUESTION # 51
In which two places can you create and edit user-defined work order statuses?

  • A. Work Execution work area tasks
  • B. Scheduled Processes
  • C. Functional Setup Manager > Setup: Manufacturing and Supply Chain Materials Management
  • D. Work Definition work area tasks

Answer: A,C

Explanation:
User-defined work order statuses can be created and edited in the following areas of Oracle Manufacturing Cloud:
* Functional Setup Manager : This is where the configuration of user-defined work order statuses is performed under the " Manufacturing and Supply Chain Materials Management " setup. Users can define new statuses and configure their behavior.
* Work Execution work area tasks : Users can also manage work order statuses directly in the Work Execution area, which is part of the day-to-day management of production orders.
Incorrect options:
* Scheduled Processes (A) and Work Definition work area tasks (B) are not areas where work order statuses are defined or edited.
Oracle Cloud ' s Functional Setup Manager and Work Execution work area documentation outline how user- defined statuses are configured and maintained.


NEW QUESTION # 52
......

Penetration testers simulate 1z0-1075-25 exam: https://protechtraining.actualtestsit.com/Oracle/1z0-1075-25-exam-prep-dumps.html