NEW QUESTION # 99
85% or more
- A. TOTAL AVAILABLE TIME
- B. What percentage of maintenance work should be proactive?
- C. Mean Time To Repair or Replace (MTTR) Formula
- D. Maintenance cost will decrease as reliability increases. (T/F)
Answer: B
NEW QUESTION # 100
the average time needed to restore an asset to its full operational capabilities after a failure, a measure of asset maintainability, usually expressed as the probability that a machine can be restored to its specified operable condition within a specified interval of time, regardless of whether an asset is repaired or replaced
- A. Mean Time To Repair or Replace (MTTR) Formula
- B. Mean Time To Repair or Replace (MTTR)
- C. Replacement Asset Value (RAV)
- D. Mean Time Between Maintenance (MTBM) Formula
Answer: B
NEW QUESTION # 101
This metric is the ratio of the number of systems in a facility for which a criticality analysis has been performed divided by the total number of systems in the facility, expressed as a percentage.
- A. Stocked MRO Inventory Value As a Percent of Replacement Value (RAV)
- B. Maintenance Training Return on Investment (ROI)
- C. Systems Covered by Criticality Analysis
- D. Maintenance Training Hours
Answer: C
NEW QUESTION # 102
Quality superiority of a product or service can be maintained if the organization:
- A. Ensures its marketing and field service quality controls are perfect.
- B. Holds product specifications constant and historically accurate.
- C. Continually promotes its claims to superior quality and market leadership.
- D. Continues product or service improvement and has effective market promotion
Answer: D
NEW QUESTION # 103
Systems Covered by Criticality Analysis (%) = [Number of Critical Systems (for which a criticality analysis has been performed) ÷ Total Number of Systems] ×
100 → Systems Covered by Criticality Analysis
- A. False
- B. True
Answer: A
NEW QUESTION # 104
A process system consists of two units,A and B. "Unit A" feeds "Unit B." such that if either unit is not operating, the system is not operating. Given the data below, calculate the annual Reliability of the system.
The system is in continuous operation
Unit A Reliability =0.40
Unit B Reliability = 0.32
t = 1 year
- A. 0.365
- B. 0.246
- C. 0.128
- D. 0.721
Answer: C
NEW QUESTION # 105
As the maintenance manager at a new plant (facility) you are developing the maintenance workforce strategy for start-up. Select the best workforce attributes for maximum effectiveness, assuming that unit labor costs are equal?
Options
- A. A managing contractor is brought on site to handle all aspects and provision of maintenance labor.
- B. Operations performing minor maintenance and company multi-skilled technicians performing complex maintenance tasks.
- C. An annual bid and selection of a maintenance labor contractor is performed, using unitcosting of tasks normally required.
- D. Multi skilled mechanical crafts (trades) and instrument electrical crafts (trades) are hired and developed.
Answer: B
NEW QUESTION # 106
% = {Uptime (hrs) ÷ [Total Available Time (hrs) - Idle Time (hrs)]} x 100
- A. UTILIZATION TIME
- B. Actual Production
- C. Availability Formula
- D. Total Units Produced
Answer: C
NEW QUESTION # 107
When an asset is unable to perform its required function. This excludes proactive work.
- A. Failure
- B. Rework
- C. AVAILABILITY
- D. Actual Production Rate
Answer: A
NEW QUESTION # 108
defined as the percentage of Actual Run Rate/Cycle Time to the Best Run Rate/Cycle Time
- A. Maintenance Training Return on Investment (ROI)
- B. Mean Time to Failure (MTTF)
- C. Maintenance Training Cost (per employee) Formula
- D. Performance efficiency (rate/speed)
Answer: D
NEW QUESTION # 109
What is a standard methodology to change the frequency of a PM inspection?
- A. (ANSI) American National Standards Institute
- B. (SMRP) Society of Maintenance & Reliability Professionals
- C. (ASME) American Society of Mechanical Engineers
- D. (RBI) Risk Based Inspection
Answer: D
NEW QUESTION # 110
Which of the following criteria is not normally used to determine if a piece of equipment is critical?
- A. Its failure may result in the breach of environmental regulations.
- B. The cost of repair or replacement is very high.
- C. Its failure will trigger the start-up of the spare.
- D. Its failure will result in loss of production.
Answer: C
NEW QUESTION # 111
Root Cause Failure Analysis has determined that 30% of premature equipment failures are due to human errors. As the maintenance manager, what would be your first step to begin improving this performance?
- A. Conduct a skills assessment of the craft (trade) workforce
- B. Implement a refresher training program
- C. Attach assembly diagrams to all work orders
- D. Increase inspection of all equipment repairs
Answer: A
NEW QUESTION # 112
The rate at which an asset is designed to produce product during a designated time period or the demonstrated best sustained rate, whichever is higher. → Best Production Rate
- A. False
- B. True
Answer: B
NEW QUESTION # 113
When forming teams to address reliability issues, four stages of team development should be recognized and managed by the reliability professional In the Performing stage, team members should not:
- A. Begin to improve and control
- B. Complete problem analysis.
- C. Swing from optimism to uncertainty.
- D. Make changes to the process.
Answer: C
NEW QUESTION # 114
......