NEW QUESTION # 45
A customer PowerSwitch deployment requires additional TOR switches as part of the architecture. Which switch OS supports MLAG instead of VLT?
Response:
- A. OS10
- B. OS6
- C. NX-OS 7.3
- D. OS9
Answer: B
NEW QUESTION # 46
What is the primary role of deployment support in a network design project?
Response:
- A. To generate network traffic reports
- B. To design network security policies
- C. To assist with the installation and setup of network devices
- D. To provide ongoing configuration updates
Answer: C
NEW QUESTION # 47
What is the purpose of deployment support in troubleshooting network issues during installation?
Response:
- A. To identify and resolve connectivity and configuration problems
- B. To provide ongoing network monitoring
- C. To configure access control lists
- D. To analyze network traffic patterns
Answer: A
NEW QUESTION # 48
A customer environment consists of the following hardware:
- 1x MX7000 with 2x MX9116n FSE
- 4x M760c blades each with a dual port network interface controller
- 2x 32 G FC switches
- 1x FC Storage Array
What are three requirements for FCoE in this environment?
Response:
- A. Link Layer Flow Control receive must be enabled.
- B. Zoning must be configured on the MX9116n switch.
- C. NPIV must be enabled on the Upstream Switch.
- D. FCoE partition must be created in NPAR on the blade servers.
- E. A one-to-one connection must exist between the MX9116n and the upstream FC switch.
Answer: C,D,E
NEW QUESTION # 49
What is the primary function of the Troubleshooting Template in network documentation?
Response:
- A. It manages software licensing for network devices
- B. It verifies network configurations after deployment
- C. It provides a detailed list of all VLANs and their configurations
- D. It records and tracks network issues and their resolutions
Answer: D
NEW QUESTION # 50
What routing protocol is recommended when designing the leaf-spine network of a customer?
Response:
- A. Static
- B. BGP
- C. IS-IS
- D. PTP
Answer: B
NEW QUESTION # 51
A customer wants to replace an existing third-party network with a Dell networking environment and redesign their environment to a modern architecture. What service meets the needs of the customer?
Response:
- A. Additional Deployment Time
- B. ProDeploy
- C. Custom SOW
- D. ProDeploy Plus
Answer: C
NEW QUESTION # 52
What is a characteristic of DAC?
Response:
- A. The serial numbers should be identical on both ends of the network
- B. DAC does not provide visible serial numbers in the CLI.
- C. The transmitting side and the receiving side have different serial numbers.
Answer: A
NEW QUESTION # 53
What does a gray background represent in an Enterprise Project Services template form?
Response:
- A. The gray section is a priority section.
- B. No material has been filled into the form.
- C. The template is out of date.
- D. The customer cannot see the information.
Answer: D
NEW QUESTION # 54
Which of the following are common components of a network design template?
Response:
- A. Network topology diagram
- B. IP addressing scheme
- C. VLAN configurations
- D. Software patching schedule
Answer: A,B,C
NEW QUESTION # 55
Layer 2 (L2) planning focuses on the configuration of __________, such as VLANs and MAC address management, to optimize network traffic flow.
Response:
- A. Firewalls
- B. Switches
- C. Routing protocols
- D. IP addresses
Answer: B
NEW QUESTION # 56
In which scenario would the FastList tool be most beneficial during the scoping phase of a network design project?
Response:
- A. When you need to prioritize and organize project requirements for a new data center design
- B. When you need to calculate the environmental requirements of a network rack
- C. When you need to generate deployment scripts for network devices
- D. When you need to estimate the cost of network hardware
Answer: A
NEW QUESTION # 57
What is a standard deployment method for an L3 network?
Response:
- A. BGP neighborship
- B. Unidirectional link detection
- C. Device link detection protocol
- D. Link aggregation control protocol
Answer: A
NEW QUESTION # 58
Match the following planning phases with their descriptions:
Phase
Physical planning
Layer 2 (L2) planning
Layer 3 (L3) planning
OS10 Licensing
Description
A) Identifies hardware locations and cable paths
B) Focuses on VLANs, MAC addresses, and switching
C) Defines routing protocols, IP addressing, and topology
D) Ensures the correct software licensing for OS10 devices
Response:
- A. Physical planning - A
- B. Physical planning - D
- C. Physical planning - B
- D. Physical planning - A
Answer: D
NEW QUESTION # 59
A Design Architect is coordinating with a sales team to provide an example of the networking capabilities of a PowerEdge MX7000 for a customer. Which networking resource meets this requirement?
Response:
- A. Demo Center
- B. VMware Hands-on Labs
- C. GNS3
- D. Enablement Lab
Answer: A
NEW QUESTION # 60
What are two methods to configure FCoE?
Response:
- A. Use NPG when upstream is an FC switch.
- B. Perform zoning at the OS10 switch in NPG mode.
- C. Use FSB mode when it connects to an upstream FCoE Switch.
- D. Configure the server port using DCB where FCoE connects.
Answer: A,C
NEW QUESTION # 61
The scoping phase is primarily focused on defining __________, deliverables, and requirements to ensure alignment with business goals.
Response:
- A. Project scope
- B. Hardware specifications
- C. Network configurations
- D. Performance metrics
Answer: A
NEW QUESTION # 62
What is the main function of the Financial Force tool during the scoping phase of a networking design project?
Response:
- A. It helps in calculating the financial budget and costs associated with the project
- B. It generates scripts for network deployment
- C. It manages network performance monitoring
- D. It tracks network traffic analytics
Answer: A
NEW QUESTION # 63
What are three design best practices when discussing the potential for a network replacement?
Response:
- A. Document the replacement steps.
- B. Review existing network configurations for Dell, Cisco, and HP switches.
- C. Recommend the one-size-fits-all solutions in the Dell Portfolio.
- D. Remove and decommission the hardware.
- E. Provide support for onsite replacement.
Answer: A,B,E
NEW QUESTION # 64
Which of the following is a key element of Post-Deployment Verification?
Response:
- A. Installing network cables
- B. Configuring VLANs
- C. Assigning IP addresses
- D. Verifying that the network's performance matches the design specifications
Answer: D
NEW QUESTION # 65
An engineer is deploying and configuring an OS10 switch. They tried to resend the license to an internal email from the Digital Licensing and Fulfillment Portal. The subject line in received email shows the product name. There was no license that is attached to the email when the engineer opened the email. Why was the license not attached to the email that the engineer received?
Response:
- A. The license should be sent from the DEE portal instead.
- B. The license can only be sent to the email address it was registered to.
- C. The account team must be involved to quote a new license first.
- D. The license must be bound to a service tag before sending the email.
Answer: D
NEW QUESTION # 66
What is the primary role of scripting tools like FastScript in network design projects?
Response:
- A. To document network changes
- B. To track network performance metrics
- C. To perform network vulnerability assessments
- D. To automate network device configuration and reduce manual errors
Answer: D
NEW QUESTION # 67
......